I continued work on the main spars. The wing inspection access panels are located on the lower surface of the wing and secured at the forward edge to the spar flange with anchor nuts, see image 1. Next I installed two anchor nuts on the inboard end of the spars. This is some of the hardware used to bolt the wings to the center section, see image 2. Finally I began the tie-down assembly installation, see image 3.